Manufacturing
Raw steel in. Finished racks out. All in-house.
Grantec is not a trader. Since 2010 we have run our own sheet-metal plant in Cixi, Ningbo — around 100 people, six R&D engineers, and the full chain from laser cutting to powder coating under one roof. That is how quality stays consistent at container volume.
Request a quote
The process
Eight steps, one roof
Every rack follows the same path — no outsourced fabrication, no middleman.
- Laser cutting3 machines
- CNC punching2 turret + 4 auto
- CNC bending9 press brakes
- Welding10 incl. robots
- 5-stage pretreatmentdegrease → coat
- Powder coatingautomatic line
- Assemblyin-house
- QCIQC → QA
Equipment
The machines that make the racks
Real equipment on our production floor:
- Laser cutting machines (2000–3000 W)×3
- CNC turret punch presses×2
- CNC press brakes (bending)×9
- Punch presses (20–110 T)×15
- Automatic step-punch press lines×4
- Welding machines & robots×10
- Automatic powder-coating line×1
On the floor
The plant in Cixi





By the numbers
Engineered for consistency and container economics
- 1.0–2.0mmSPCC cold-rolled steel gauges
- 4–5mmTempered-glass doors
- 5-stagePre-treatment before coating
- 2Standard RAL colours, more on request
- 64%Freight saved, flat-pack
Flat-pack container math
Most cabinets flat-pack into a small number of packages, which slashes shipping volume. Knock-down shipping cuts freight by up to 60% versus an assembled cabinet — so you load far more racks per container.
We size cartons to your order and loading practice. Container quantities depend on your product mix — send us your order and we will prepare a loading plan.
Taoyuan East Road, East Industrial Zone, Cixi, Zhejiang, China
Open in Google Maps2F, 10 Lingyun Road, High-Tech Zone, Ningbo, China
Open in Google Maps