Quality control

Inspected at every stage, by 10 dedicated QC staff

Consistency at container volume is the question every distributor asks. Grantec answers it with four named inspection stages, batch testing on real instruments, and an ISO 9001 quality system — so the tenth container matches the first.

  1. IQC

    Incoming inspection

    Steel gauge, tempered glass, locks and bought-in parts are checked before they enter production.

  2. IPQC

    In-process inspection

    Dimensions, hole positions, welds and coating are checked during fabrication, not just at the end.

  3. FQC

    Final inspection

    Assembly, door fit, rail alignment and finish are verified on the finished cabinet.

  4. QA

    Outgoing assurance

    Packing, labelling and documentation are confirmed before the container is sealed.

Test instruments

Every batch is measured, not eyeballed

Three instruments keep coating and colour within spec:

  • Salt-spray test chamber

    Verifies coating corrosion resistance.

  • Coating-thickness gauge

    Verifies powder-coat film thickness.

  • Colorimeter

    Verifies RAL colour consistency batch to batch.

Ask for a sample or an audit

We welcome factory audits and sample orders before your first container.

Contact us